Sunday, November 3, 2013
What's next
As we reflect back on our 4-1/2 days of progress, we think of what needs to be done yet. As it was mentioned we did start the generator, but we have control wires and programming to do before that is fully operational. We have to wait on PNG Power to run a new service drop into the Supply Building where we have the main service installed before we can dismantle all of the existing power. Sas, the contractor, told me this will be Monday, but we are not holding our breath on this. Pray for us that we will not be hindered this week.This is now Sunday morning here and it has been raining for a few hours. The clouds are heavy and we can barely see the end of the International Airport from our deck as we are sitting here sipping our morning coffee. We look forward to a relaxing day and perhaps some time to reflect on and discuss some future projects. Thank you for following us and for thinking of us. We have gained a wealth of information here as to the inner workings of the church planting ministries going on here in this needy country.
Saturday, November 2, 2013
1 week complete
Well it has been a full week since we left the USA and we have accomplished everything we have set out to do to this point. We worked a half day today and were able to test fire the generator with success. It rained throughout the night last night and created a very muddy mess for us this morning. When the sun finally cut through the clouds the temp rose quickly, thankfully it was just about lunch time. Being that it is Saturday and very hot, Tom decided to call it a day at 12:30 and give us the afternoon to relax. Tomorrow is Sunday and we will have the day off for fellowship and relaxation.
Friday, November 1, 2013
A Prosperous Friday
| Mike and Dave feed wire for the main service |
| The ladies chat with Tom after picking up some thing from the NTM store |
| A "meeting of the minds" in the shop. |
| Our next door neighbors begin to prepare their dinner |
Thursday, October 31, 2013
Oct. 31st
We have WiFi! Well soft of....it kinda comes and goes, so we are making the best of it! Speaking of making the best of it....The sun came out today and dried up the mud from yesterday, giving us a very productive work day. The majority of the conduits are in the ground and several hundred feet of wire have been pulled, including the overhead line above the ravine between the two compounds. We plan to have the rest of the conduits laid and wire pulled through them tomorrow. The ladies on the team continue to gather fresh produce and make us fantastic meals to keep us strong and nourished for the work we are doing.
The time zone difference of literally half a day has made communicating with home a bit difficult, and we all want you to know we are thinking about you back home and wishing we could talk to you as much as you are thinking about us way down here. The support work achieved through this Base Camp reaches out to about a dozen tribes and our work here will help to make that outreach happen. It's amazing to hear the stories from the field missionaries and those who work in the shadows to support them. I know what we accomplish here will be used for years to come and will bring countless members to the family of believers.
Sas came this morning to deliver the electrical permit for the work we are doing..jpg)
Crocodiles can grow to enormous sizes and this one was about 20' long and over 100 years old.
This photographer was taking photos of the work site from the air.
The time zone difference of literally half a day has made communicating with home a bit difficult, and we all want you to know we are thinking about you back home and wishing we could talk to you as much as you are thinking about us way down here. The support work achieved through this Base Camp reaches out to about a dozen tribes and our work here will help to make that outreach happen. It's amazing to hear the stories from the field missionaries and those who work in the shadows to support them. I know what we accomplish here will be used for years to come and will bring countless members to the family of believers.
Sas came this morning to deliver the electrical permit for the work we are doing.
.jpg)
Crocodiles can grow to enormous sizes and this one was about 20' long and over 100 years old.
This photographer was taking photos of the work site from the air.
Wednesday, October 30, 2013
Second day of work
Today was Wednesday, our second full day of work. It started out raining cats and dogs during the wee hours of the morning and continued drizzling into our work day. We all got more sleep and woke up refreshed. Since we had some wet areas to work in, we spent time this morning in a devotional led by Mike B. There was a lot of good discussion. Karen and Linda worked together with NTM back in the 1980's and beyond in this very compound and there has been much reminiscing going on. They are planning a float plane trip into the May River area where they worked in the tribe and are very hopeful that this trip can become a reality. Much has changed here in PNG since their tenure here and as Kelly joined us for a time, he explained a lot of what the NTM people are doing in this area. This was new information to some of the team who are not real familiar with NTM. I am sure that as our time here continues, we will all become very familiar with how the Lord has been working in this island that has 800 distinct people groups each with their own language. There are many unreached areas of this island and there is room for more pioneers who are willing to serve the Lord full time here.
After this devotional time, the contractor, Sas, arrived for the drawings I had been working on yesterday afternoon. I gave these to him and then we began our work. One of the issues that quickly surfaced was a lack of tools needed to cut holes and knockouts in our panels. We quickly wore out a 2-1/2" hole saw on one hole in one of the Automatic Transfer Switches. We tried various methods to remove knockouts only to be resigned to the fact that we were severely handicapped not having the proper tools. Nathan, from the compound here, picked up a hole saw from Mike at Friends In Action, but this was not a very sharp one either. Finally around lunch time he returned to us with two brand new 2-1/2" Bi-Metal hole saws. This was an answer to prayers and we were able to cut most of the remaining holes in the ATS's using only one of the new hole saws. God certainly knows our needs before we do as these were the only two hole saws available here in Wewak, so He held them in store for this project.
Sas came back to the site two more times to go over just what we are planning to do. We will still need some more materials, since we did not send enough PVC fittings in the shipping container. Fortunately, as we began to investigate how we might overcome this new giant obstacle, we discovered that the 50mm pipe available here is somewhat close to our US 2" PVC. Nathan will be buying us fittings for this size as well as the 25mm pipe which corresponds to our 1" PVC.
We were able to mount the Automatic Transfer Switches and an electrical panel, and complete the conduit running to the generator building. Following this we pulled wires into this conduit and began making connections at the generator. Tomorrow we will hopefully complete this conduit and wiring at the other end. Then it may be possible that the new generator could be started and run during power outages. This could be an immediate solution to the need here until we are able to finish the wiring completely and have the generator in full standby mode. Power was off yesterday for over 5 hours and since the old generator had been removed in the Upper Compound, that part of the campus was totally out of power, while an older, failing generator ran the Lower Compound.
Meeting with Sas the contractor and Soma the inspector to go over our plans.
Below is a photo of our fine cooks who are taking good care of us. We have been eating very well thanks to them!
Here are some shots of the work today.
Mike's missing luggage has gotten as far as Port Moresby. He is hoping to have it by tomorrow...
After this devotional time, the contractor, Sas, arrived for the drawings I had been working on yesterday afternoon. I gave these to him and then we began our work. One of the issues that quickly surfaced was a lack of tools needed to cut holes and knockouts in our panels. We quickly wore out a 2-1/2" hole saw on one hole in one of the Automatic Transfer Switches. We tried various methods to remove knockouts only to be resigned to the fact that we were severely handicapped not having the proper tools. Nathan, from the compound here, picked up a hole saw from Mike at Friends In Action, but this was not a very sharp one either. Finally around lunch time he returned to us with two brand new 2-1/2" Bi-Metal hole saws. This was an answer to prayers and we were able to cut most of the remaining holes in the ATS's using only one of the new hole saws. God certainly knows our needs before we do as these were the only two hole saws available here in Wewak, so He held them in store for this project.
Sas came back to the site two more times to go over just what we are planning to do. We will still need some more materials, since we did not send enough PVC fittings in the shipping container. Fortunately, as we began to investigate how we might overcome this new giant obstacle, we discovered that the 50mm pipe available here is somewhat close to our US 2" PVC. Nathan will be buying us fittings for this size as well as the 25mm pipe which corresponds to our 1" PVC.
We were able to mount the Automatic Transfer Switches and an electrical panel, and complete the conduit running to the generator building. Following this we pulled wires into this conduit and began making connections at the generator. Tomorrow we will hopefully complete this conduit and wiring at the other end. Then it may be possible that the new generator could be started and run during power outages. This could be an immediate solution to the need here until we are able to finish the wiring completely and have the generator in full standby mode. Power was off yesterday for over 5 hours and since the old generator had been removed in the Upper Compound, that part of the campus was totally out of power, while an older, failing generator ran the Lower Compound.
Meeting with Sas the contractor and Soma the inspector to go over our plans.
Below is a photo of our fine cooks who are taking good care of us. We have been eating very well thanks to them!
Here are some shots of the work today.
Mike's missing luggage has gotten as far as Port Moresby. He is hoping to have it by tomorrow...
Be Flexible
Wewak is right on the coast of PNG and as you saw in the other photos our view of the coast from up here on the hill is impressive. Unfortunately we have to look at that all day long as we work - terrible.
As Shane mentioned, we were visited by the contractor whose license we must work under, as well as the electrical inspector we will have to please. As it turns out a permit must be applied for and secured to do the work. It required an emergency session of creating some CAD drawings that outline our proposed scope of work. The scope has changed because he did not want to have two points of attachment here at the compound as we originally planned on doing. We had to re-think our plan and figure out if we have enough materials here to make his directive happen. After much discussion among ourselves and with him, we reached an amicable agreement and it looks like we can proceed with no problems. We may not have a permit before we leave here, but the work will be satisfactorily done, we are convinced. So I spent the rest of the afternoon drawing and redrawing and finally gave the files to Kelly here so that he can print them out for the contractor to pick up this morning. Please pray that all of this will be done and that everything will be fine. The Lord knew of these plan changes before we left the USA, so we are thankful He is in control. Sometimes we feel helpless when we feel things are beyond our control and we are trusting Him more all the time.It is Wednesday morning and we are waiting out a several hour rainfall that also plays havoc on our plans...
Tuesday, October 29, 2013
Welcome to Wewak